Showing posts with label The Factory. Show all posts
Showing posts with label The Factory. Show all posts

Friday, July 4, 2014

A Good 4th of July

Today I got some stuff to run new lights in the garage, and I also stopped by Harbor Freight and picked up the 30" bending brake and some clamps. I spent the rest of the afternoon wiring up the lights, and realized that I will need a few more. At least now I have a well lit workbench.

I needed to finish my form backing block so I cut that out with my jig saw and sanded it down. I have had really good luck with my Harbor freight belt sander so far. Once I had it sanded down I clamped the two together and started drilling my jig pin holes. That is as far as I made it today.

Harbor Freight 30" Bending Brake w/ two c-clamps


Slight set back for hammering over flanges

Drilling jig pin holes

Monday, December 9, 2013

EAA workbenches

It seems like a right of passage for home builders to build workbenches for their project therefore I, too, built my EAA workbenches. It took about 4 hours and about $100 in lumber.

 I am brainstorming about a wall mounted drop down drafting table to hold my plans. 


Thursday, December 5, 2013

Got my plans today!!!

This is what you get when you open the box. 
From left to right: envelope, bear tracks card, picture, Mylar wing rib plan,
Bearhawk book (compilation of Beartracks newsletters), packing slip, plans. 

I am still in the process of getting The Factory set up how I want it, but I will post as I go along. It is supposed to be very frigid here in East Texas so I will use my indoor time to build some EAA workbenches. 

I have ordered an 18x24 portfolio to hold all the plans so I can flip thru them page by page, but until it gets here I got this artwork folder to hold them and flatten them out a little.